The Hellems Arts andÌýSciences building renovation is underway, and the project includes multiple aspects designed to reduce the building’s environmental impact:
-
The Energy Use Intensity (EUI), or the amount of energy used in a building per square foot annually,Ìýin Hellems is projected to decrease by 68% even with the addition of air conditioning.
-
ÌýThe building will have a new high-efficiency mechanical system designed to accommodate the campus’s future conversion to a low-temperature hot-water heating system.
-
ÌýIncreased thermal performance: The building will have triple-pane high-efficiency windows, increased insulation in the walls and roof and local, LEED-certified materials.
-
ÌýSustainability consultants performed daylight studies to maximize access to natural light.
-
ÌýAnother benefit of the renovation is the reduction of embodied carbon due to building and material reuse. For example, the existing terrazzo and wood flooring is being refurbished and reused, and wood transoms are being salvaged and integrated into the finishes of the office wing.
Hellems is expected to reopen in winter 2025–26. Learn more about the renovation project.
Dates to save, links to bookmark
- Campus Sustainability Executive Council to add student government representatives—March meeting summary
- ÌýApril 12
- Campus Sustainability SummitÌýApril 24–25
- for the sustainability summit
- for a Campus Sustainability Award
- Join the Sustainable Buffs Community
- Share your sustainability ideas